Projects List

Main sewer network design along the Kalyvia - Lagonisi main road
Design of an ~118Km extension sewer network
Main and secondary sewer network design
- Plateau’s water diversion works (sinkholes, ditches, water intake works). - A 3,5km long diversion tunnel with an... + details
 - Gabion wall scour protection works  - Culvert design and energy dissipation works  - River training works design
- ~ 55 m high earthfill dam  - Foundation and abutment grouting is essential in order to minimise water losses
The water supply/irrigation system design proposals were all in accordance to the archealogical site restrictions.
The training works proposed were:  - rockfill and gabion weir structures - energy dissipation structures
The stormwater and drainage works design of the 180km2 basin refer to : - The main higway, 19.235 km long - Three (3... + details

Pages

Quick Start

   Sitemap

    Careers

   Profile

   Search

Follow Us

LinkedIn icon
YouTube icon

Contact Us

3 Evias Str. 15125, Maroussi,
       Athens, Greece

  +30 2108064543

  +30 2108055495

  info@hydroex.gr

© Copyright 2013. Hydroexigiantiki Consulting Engineers Back to Top

Back to Top