Project description
Scope: 

Design of water treatment works for the city of Rhodes

Description: 

The Gadouras Dam Reservoir supplies the water treatment works. The treatment works are part of the overall water supply scheme of Rhodes from Gadouras.
The works included:
- The plant consists of inlet works, polyelectrolyte and alum dosing and storage facilities, sludge blanket clarifiers, rapid gravity filters, disinfection units and potable water storage tanks.
- The maximum design flow is 60.000 m3/day for the first phase and 120.000 m3/day for the final phase.
- The scope of works also includes an access road 800m long, as well as storage tanks and a pumping station for the potable water to the storage tanks.

Quick Start

   Sitemap

    Careers

   Profile

   Search

Follow Us

LinkedIn icon
YouTube icon

Contact Us

3 Evias Str. 15125, Maroussi,
       Athens, Greece

  +30 2108064543

  +30 2108055495

  info@hydroex.gr

© Copyright 2013. Hydroexigiantiki Consulting Engineers Back to Top

Back to Top