view"> view"> Jan 12 By admin
data-1
The project comprises of 5 discrete phases: Data entry and processing. Software and equipment supply for…
view"> view"> Jan 12 By admin
placeholder
Masterplan for the diversion works considering hydrologic data, environmental issues and hydro-power…
view"> view"> Jan 11 By admin
stylida-1
The stormwater and drainage works design of the 180km2 basin refer to : The main highway, 19.235 km long
view"> view"> Jan 11 By admin
nikopolis-1
The water supply/irrigation system design proposals were all in accordance to the archealogical site…
view"> view"> Jan 11 By admin
elbasan-1
Gabion wall scour protection works. Culvert design and energy dissipation works. River training works…
view"> view"> Jan 11 By admin
lassithi-1
Construction of a 90Km long external pipeline from the Aposelemis Dam water treatment plant to Agios…
view"> view"> Jan 11 By admin
pikermi-1
Main and secondary sewer network design.
view"> view"> Jan 11 By admin
kalyvia-1
Design of an ~118Km extension sewer network.
view"> view"> Jun 13 By admin
agiokampos-1
Potential failure mechanisms (overtopping and piping) were considered. 1D and 2D flood wave propagation…
view"> view"> Jun 13 By admin
aposelemis-2
Potential failure mechanisms (overtopping and piping) were considered. 1D and 2D flood wave propagation…
view"> view"> Jun 13 By admin
gadouras-2
Potential failure mechanisms (overtopping and piping) were considered. 1D and 2D flood wave propagation…