linkedin
instagram
youtube
tel
Reach Us: +30 2108064543 & +30 2108055495
Select your language
English
Greek
Company
Profile
Quality
Publications
Services
Projects
List
Map
Careers
Contact
Breadcrumb
Home
Procurement
Jan 14
By admin
Aposelemis Dam, Water Treatment and Water Supply Projects in Northern Crete
The dam is 56 m heigh. It is of rockfill type with an impervious clay core, upstream and downstream rock…
Jan 13
By admin
Design of the Smokovo irrigation network
Designed works include: A main water intake steelpipe is 2500mm, combined with a hydroeletric power…
Jan 12
By admin
Gadouras dam. Water treatment and supply works in Rhodes island
The project includes the Gadoura dam and appurtenant works construction, the water mains to the town of…
Jan 12
By admin
Design of water supply works (pipelines-treatment plant) for Athens
Designed works include: A main 6.25Km long external pipeline with diameter 1700mm and 5.5 m3/sec flow…
Jan 12
By admin
Design of the water supply extension of the Gadouras dam pipelines and water mains to the city of Rhodes
The project involves the extension of the existing pipeline to a wider area, covering potable water…
Jan 12
By admin
Study ot the water supply network and technical consultant for assisting DEYAMV in modernisation, zone separation and automatization of the water network of Volos region
Pipeline and network design for the water supply of the city of Volos and its suburbs
Jan 12
By admin
Extension of the water supply network of Karditsa
Design revision was necessary due to the network’s extension.
Jan 12
By admin
Final study of the primary and secondary irrigation and drainage network of area II in Serres
This project is part of the reallocation plan for the plain.
Jan 12
By admin
Environmental flood protection works in urban areas - Adjustment of Xerias stream in Korinthos
Xerias river basin has an area of 174 km2 and extends from the town of Korinthos (North) to the Southern…
Jan 12
By admin
Triantafyllia dam and appurtenant structures design / Technical Consultant for Triantafylia dam works construction
It is a rockfill dam with clay core, 77m high and 560m crest length. The total volume of the dam is 2.…
Jan 11
By admin
Highway design for the update of the New National Road into a Highway (ΠΑΘΕ), section: Stylida - Raches (Chainage 12+000 - 32+000)
The stormwater and drainage works design of the 180km2 basin refer to : The main highway, 19.235 km long
Jan 11
By admin
Design of Lassithi plateau diversion tunnel to Aposelemis dam and its water supply extension to Agios Nikolaos
Construction of a 90Km long external pipeline from the Aposelemis Dam water treatment plant to Agios…
Top